Alacer Gold, with operations in Turkey with Çöpler Gold Mine, shared information about their Gediktepe and Ardıç Projects. The company announced an additional 345,000 contained gold ounces to the indicated Ardıç mineral resource. The updated mineral resource estimate consists of predominantly oxide ore, with some sulfide ore, totaling indicated mineral resource of 639,000 ounces of gold at an average grade of 1.50 Au g/t (13.2 mt) and inferred mineral resource estimate of 96,000 ounces at an average grade of 1.16 Au g/t (2.6 mt)
Being adjacent to the Çöpler Mine, Ardıç has the processing facilities with an existing access road connecting the nearby Ҫakmaktepe operations. Alacer stated permits have been received for allow step-out drilling in the most prospective areas to the southeast of the Ardıç Mineral Resource. After exploration length of the mineralized target extended over 2 km. Continuing exploration at Ardıç, The company stated mineralization remains open in all directions.
Alacer also shared updated prefeasibility report for Gediktepe project. According to the report Gediktepe project contains measured and Indicated Mineral Resource of 878,000 ounces of gold, 29.8 million ounces of silver, 537 million pounds of copper, and 1.05 billion pounds of zinc.
Total recovered metals ( including both doré and concentrates) of 345,000 ounces of gold, over 8 million ounces of silver, 254 million pounds of copper and 626 million pounds of zinc.
Life-of-Mine production is expected to be 11 years with a project payback of 4.1 years. in the project it is planned that oxide ore will be processed predominantly for the first 2 years. While the oxide ore treatment rate is 1.1 million tonnes each year in a carbon-in-pulp (CIP) plant. The sulfide treatment rate is 2.4 million tonnes each year, processing the polymetallic sulfide ore in a concentrator to produce separate copper and zinc concentrates.
Pre-production capital expenditure of $164 million is required for the oxide ore phase with an additional $71 million in Project capital required for the sulfide ore flotation plant and related infrastructure.
After smelter recoveries, total revenue is estimated to be $1,880 million, which is equal to 1.43 million AuEq ounces.
PFS study for Gediktepe identified a positive business case recommending a relatively small amount of work be completed for progression of the Gediktepe Project to a feasibility study level. This work requires additional drill permitting and drilling followed by metallurgical test work and analysis.