Centerra Gold shared its 2021 year-end estimates for mineral reserves and mineral resources.
According to the update shared by the company, total proven and probable gold mineral reserves of Öksüt Mine were recorded as approx 1.1 million ounces of contained gold (30.5 million tonnes at an average gold grade of 1.16 g/t gold) at December 31, 2021.
Measured and indicated gold resources of the Öksüt Mine were recorded as 283.000 contained gold (17,720 million tonnes at an average gold grade of 0.50 g/t) at December 31, 2021
The company also shared information about the exploration programme realized in the Öksüt Mine. A total of 31,525 metres in 159 drill holes were completed in the 2021 drilling program. The 2021 drilling program contributed to increased resource expansion and development around the known deposits (Keltepe, Güneytepe, Keltepe N and Keltepe NW).
The company noted that the oxide gold mineralization that has been delineated at Keltepe N, Keltepe NW and now at Keltepe NNW requires additional infill drilling, which will commence in the first quarter of 2022.
The company noted that in Sivritepe project, a total of 15,459 metres in 62 drill holes were completed in 2021. Centerra Gold stated that drilling mainly targeted gold-in-soil geochemical anomalism and succeeded in identifying multiple mineralized zones. Drilling at the two major prospects, Sivritepe West and Sivritepe East, was specifically designed to be able to define potential gold resources. The drilling data received to date indicates that the identified mineralized zones are still open along strike and at depth and need to be targeted by infill and step-out drilling in the 2022 drilling season.











