DPM Metals said that it has extended the life of its Chelopech gold and copper mine in Bulgaria by 10 years, to 2036, based on updated mineral reserve estimates.
The updated proven and probable mineral reserve estimate of 1.6 million ounces of gold and 308 million pounds of copper supports the extended mine life and sustains production at an average rate of approximately 160,000 gold equivalent ounces per year, DMP said in a press release on last week.
“Our updated mineral reserve estimate, which extends Chelopech’s mine life to 10 years, is a strong indication of Chelopech’s track record of replacing mineral reserves, and we believe there is potential to continue this trend going forward,” DPM Metals CEO David Rae said.
Relative to the previous mineral reserve estimate, the updated data represents a net growth of 42% in tonnage and a 12% rise in gold content, as well as a 10% climb in copper content.
The upgraded estimate does not cover the Wedge Zone Deep (WZD) discovery, located within the northern flank of the Chelopech mine, for which an update on drilling results in projected in the second quarter of this year.
“We continue to be excited by the Wedge Zone Deep discovery, which underscores the potential at our core operation to add high-grade Mineral Resources within the Chelopech mine concession, extend mine life and enhance long-term value for all stakeholders,” Rae added.
Along with the Chelopech mine, DPM also operates another mine in Bulgaria – Ada Tepe. Elsewhere in Southeast Europe, DPM has mines and projects in Serbia and Bosnia.











