East Star Resources shared the first batch of results from drilling programme which was conducted in September 2021 on the Apmintas license located Kazakhstan.
The company noted that 12 holes drilled at “Novoe” target in September 2021. The drilling programme includes total 51 drilling hole for 7 exploration target.
The drilling which was conducted on the Apmintas License located in the Chu-Ili gold belt, returned high grades of 4.51 g/t Au over 63 meters starting from surface, up to 14.35 g/t over 19 meters from 44 meters. The company stated that the discovery hole ended still in the mineralisation, leaving it open at depth.
The company noted the vein system has stockwork style mineralisation. Results from other holes in the initial programme counted four higher grade veins, one of which included a bonanza grade zone which measured 131.4 g/t gold in two meters.
Noting that the Data from an ultra-high resolution drone-based survey flown in September 2021 is currently being processed to determine strike extent and direction, the company will be used in planning follow-up diamond drilling exploration expected to commence in Q2 2022.”
East Star CEO, Alex Walker, commented on the drilling results: “We are delighted to report outstanding high-grade intersections from the first set of assay results received from our 51-hole September 2021 drilling programme. The discovery hole shows high grade gold hosted within near vertical stockwork mineralised zones close to surface. Four higher grade veins include a bonanza grade zone of 2m at 131.4 g/t.
AP_008 hole was collared close to artisanal workings where historic lump samples assayed up to 401.7 g/t. Data from an ultra-high resolution drone-based survey flown in September 2021 is currently being processed to determine strike extent and direction and will be used in planning follow-up diamond drilling exploration expected to commence in Q2 2022.”











