Eti Maden is making a new investment in Bandırma, Balıkesir for the production of lithium, which is one of the important raw materials for energy transition. The total cost of the project, which is planned to produce 120 tons of lithium per year, is expected to be 90 million TL.

It is planned to synthesize lithium compounds in the facility, which will be located within the borders of Directorate of Bandırma Boron and Acid Factories Operation, which belongs to the General Directorate of Eti Maden Operations. In the project, besides lithium compounds, borax decahydrate and water will be recovered to increase the efficiency of the plant.

When the facility is completed, it is expected that 12 people will be employed, while the construction and assembly processes of the facility are expected to be completed in 22 months and the life of the project will be 50 years.

 

. .

Previous articleKyrgyzstan and Centerra Gold are Close to Settling The Dispute on Kumtor Gold Mine
Next articleAya Gold&Silver Reports Positive Drilling Results from the Zgounder Silver Mine