Iran will build two gold processing plants with a combined capacity of 2.7 million tonnes per year in South Khorasan province.
Head of South Khorasan Industry, Mining and Trade Organization, Abbas Jorjani stated that currently machinery and equipment installing process continues in the the Shadan and Hirad ore-processing plants and the plants are expected to complete at the end of the current Iranian year in March 2022.
The Shadan gold mine with definite reserves of 27.8 million tonnes and Hirad with reserves of about five million tonnes of gold ore are operating in the cities of Khusf and Nehbandan.
They have an annual extraction capacity of 2.6 million tonnes and 100,000 tonnes respectively, according to Jorjani.
Shadan, operated by knowledge-based Iranian company Karand Sadr Jahan, is the largest gold extraction prospect in Iran’s east which is also home to the massive Sangan iron ore deposits.
Iran’s proven gold reserves are estimated at 340 tonnes, but officials believe this figure would rise much higher with extensive prospecting.











