Eldorado Gold Corporation shared the fourth quarter and full year 2020 preliminary production results. According to the preliminary results, the company achieved its 2020 production guidance.
The company’s preliminary production results shows that 2020 gold production increased %39 copared to 2019 and realized as 528,874 ounces. The gold production falls between the consolidated production guidance of the company which was 520,000 and 550,000 ounces.
Eldorado gold also shared production results of its operation in Turkey, Kışladağ and Efemçukuru. While Kışladağ produced 56,816 ounces of gold in the last quarter of 2020, annual preliminary gold production recorded as 226,475 ounces. Eldorado highlighted the performance of the Kışladağ Gold mine by saying “Kisladag finished the year with strong fourth-quarter gold production, driven by improving heap leach performance.”
Other operation of the company, Efemçukuru Gold Mine was produced 25,828 ounces a gold in fourth quarter of 2020. Annual production was realized as 99,835 ounces of Gold.
Eldorado President and Chief Executive Officer George Burns commented about 2020 preliminary results: “Delivering on our production guidance amid a year of unprecedented external challenges is a testament to the dedication and resilience of our people, Our unique portfolio of high-quality, long-lived mines and projects will continue to position Eldorado for sustained success in the years ahead.”
Eldorado Gold also announced appointment of the Chair of The Board Steve Reid replacing George Albino. Serving as a director on the Eldorado Board since May 2013 and having 40 years of experience in the mineral resource industry, Raid served as the Executive Vice President and Chief Operating Officer for Goldcorp Inc. from 2007 to September 2012. Before joining Goldcorp, Reid spent 13 years at Placer Dome in numerous corporate, mine management and operating roles.











